Pre-installation
- Ensure all the products are in same lot nombor i.e. same manufacturing date.
- The products have to be kept in the installtion site at least 2 days.
- Remove all dirts and stains on the surface to be install.
- Repair uneveness or crack on the floor with filter.
- The products have to be kept in the installtion site at least 2 days.
- Remove all dirts and stains on the surface to be install.
- Repair uneveness or crack on the floor with filter.